Documents

Fly Ash Pond

Fugitive Dust Control Plan 9-21-2015

Notification Of Intent To Close 10-22-2015

Annual Engineering Inspection Report 12-31-2015

Liner Design Certification 8-01-2016

Initial Hazard Assessment Certification 8-01-2016

Annual Fugitive Dust Report 9-30-2016

Initial Design Flood Control Plan 10-09-2016

Structural Stability Assessment 10-09-2016

Safety Factor Assessment 10-09-2016

History of Design and Construction 10-16-2016

Initial Closure Plan 10-16-2016

Initial Post-Closure Plan 10-16-2016

Bottom Ash Pond

Fugitive Dust Control Plan 9-21-2015

Annual Engineering Inspection Report 12-31-2015

Liner Design Certification 08-01-2016

Initial Hazard Assessment Certification 8-01-2016

Annual Fugitive Dust Report 09-30-2016

Initial Design Flood Control Plan 10-09-2016

Structural Stability Assessment 10-09-2016

Safety Factor Assessment 10-09-2016

History of Design and Construction 10-16-2016

Initial Closure Plan 10-16-2016

Initial Post-Closure Plan 10-16-2016

Landfill

Fugitive Dust Control Plan 9-21-2015

Annual Engineering Inspection Report 12-31-2015

Annual Fugitive Dust Report 9-30-2016

Initial Run-on and Run-off Control Plan 10-16-2016

Initial Closure Plan 10-16-2016

Initial Post-Closure Plan 10-16-2016